The CY2013 Flow Certification Form is now available online at:http://www.dec.ny.gov/docs/water_pdf/flowcert.pdf
This form allows for publicly owned treatment works (POTWs) to report to NYSDEC data and information required by State Pollutant Discharge Elimination System (SPDES) Part 750-2.9(c). For details on this, and other portions of Part 750, go to:http://www.dec.ny.gov/regs/4584.html
Hard copies of the flow certification form (and instructions) will be mailed during February 2014. The complete and properly signed form is due to the NYSDEC – Albany office by March 28, 2014. Electronic submissions of the form are not acceptable.
Please contact your SPDES inspector or the Regional Water Engineer should you have any questions on flow certification reporting requirements. Contact information is available on the flow certification instructions or at: http://www.dec.ny.gov/about/558.html
Category: